Utility Projects
See how Orbital supports your ability to deliver safe, reliable and affordable energy solutions to your communities.
Featured
Federal Funded Maintenance Program Management
Natural Gas
Federal Funded Maintenance Program Management
Natural Gas
Scope of Work
- Lead multi-year remediation program targeting pipeline crossings, attachments, station coatings, and vehicular protection
- Developed and manage program execution for both distribution and transmission assets
- Coordinated engineering design, field documentation, and construction oversight
- Implemented phased strategy to address incomplete records, stakeholder coordination, and environmental constraints
- Updated scope to reflect evolving regulatory standards and risk assessments
Deliverables
- Engineering design packages for crossings, coatings, and protection devices
- Document control system for tracking as-builts, construction status, and compliance
- Quality assurance and quality control oversight during construction with daily/weekly field documentation
- Program tracking tools for budget, schedule, and asset-level progress
- Stakeholder communication framework to support utility, municipal, and contractor coordination
- Lessons learned and continuous improvement reports
Project Highlights
- The project successfully remediated all 23 targeted sites, and in 2024 the program expanded to include additional station coating and vehicular protection scope. The initiative supports the long-term goal of remediating over 800 assets by 2026, with an adaptable framework that accommodates evolving scope and shifting regulatory focus, providing full lifecycle support from design through construction, quality assurance, quality control, and final documentation.
More Projects
Utilities
138kV Substation Expansion
Substation Engineering
Featured
Natural Gas Processing
Natural Gas
Featured
345k Double Breaker Interconnect Substation
Construction Management
Utilities
Management Programs
Construction Management
Utilities
Inlet/Outlet Valve Evaluation
Natural Gas
Utilities
Odorant Replacement Project
Natural Gas
Utilities
138kV Generation Line Interconnection
Transmission Line Engineering
138kV Generation Line Interconnection
Transmission Line Engineering
Overview
- Location: Indiana
- Client: Midwest investor-owned utility
- Timeline: 12 months
Scope
- Designed 138kV generation tie line to connect into existing substation in PLS-CADD.
- Designed a temporary configuration for the 138kV feeder line to maintain power while substation expansion occurred.
- The final configuration comprised of three engineered monopoles and one engineered H-Frame on foundations.
- Plan and Profile Drawings, Framing Drawings, Load Tree Drawings, Foundation Design Drawings, Stringing Charts, Staking Tables, Worklists, and Material Lists
More Projects
Utilities
138kV Substation Expansion
Substation Engineering
Featured
345k Double Breaker Interconnect Substation
Construction Management
Utilities
Management Programs
Construction Management
Utilities
Inlet/Outlet Valve Evaluation
Natural Gas
Utilities
Odorant Replacement Project
Natural Gas
Featured
Federal Funded Maintenance Program Management
Natural Gas
Utilities
New Client Connections
Electric Distribution Engineering
New Client Connections
Electric Distribution Engineering
Scope of Work
- Construction design of a new overbuilt double 15kV circuit
- Designed new overhead extension dedicated for new customer while maintaining operation of underground services for surrounding industrial customers
- Completed demolition of existing underground facility services and distribution equipment
- Coordinated design with customer equipment, construction and in-service dates
Deliverables
- Site visits to scope and assess constructability of underground service
- Produce a detailed design and construction package (cost estimate, design sheets, design maps, bill of materials, circuit diagram, and material reservation using client work management application)
- Coordinate easement and permit research and secure permits with local & state jurisdiction
- Create and distribute construction packets to appropriate line shops
- Provide design support during construction
Project Highlights
- Successfully achieved customer cost commitments on a expedited schedule and provided critical support to our utility partner when internal design resources were unavailable to meet the project scope and schedule.
More Projects
Utilities
138kV Substation Expansion
Substation Engineering
Featured
345k Double Breaker Interconnect Substation
Construction Management
Utilities
Management Programs
Construction Management
Utilities
Inlet/Outlet Valve Evaluation
Natural Gas
Utilities
Odorant Replacement Project
Natural Gas
Featured
Federal Funded Maintenance Program Management
Natural Gas
Utilities
Overdue Pole Audit
Electric Distribution Engineering
Overdue Pole Audit
Electric Distribution Engineering
Scope of Work
- 1549 poles were identified failing inspection but had no record of being replaced between 2015-2020
- Field audit identified poles and document findings
- Created design packets for poles that have not been replaced
Deliverables
- Report of findings from audit including, photos and checklist noting branding, inspection tags, double wood, reinforcements, and additional items
- Produce a detailed design and construction package (cost estimate, design sheets, design maps, bill of materials, circuit diagram, and material reservation)
Project Highlights
- Orbital spatially enabled a prioritized list of utility poles to assess potential replacements. A custom inspection schema was deployed in a field data collection app. All collected information was synced to a centralized GIS dashboard and database, enabling automated generation of photo reports for poles flagged for replacement, streamlining the creation of bid packages for construction teams.
More Projects
Utilities
138kV Substation Expansion
Substation Engineering
Featured
345k Double Breaker Interconnect Substation
Construction Management
Utilities
Management Programs
Construction Management
Utilities
Inlet/Outlet Valve Evaluation
Natural Gas
Utilities
Odorant Replacement Project
Natural Gas
Featured
Federal Funded Maintenance Program Management
Natural Gas
Featured
Double Wood Mitigation Program
Double Wood Program Managment
Double Wood Mitigation Program
Double Wood Program Managment
Overview
- Location: Nationally
- Client: Multiple
- Timeline: Annual Program
Scope
- Manage all facets of the client’s double wood program for their electric service territory in support of infrastructure improvement and joint-use projects.
- Scouting
- Orbital team documents all double wood locations in a specified geography by identifying unknown/undocumented locations and field verifying known locations.
- Field Data Collection
- Orbital team collects all relevant data for pole including location coordinates, pole number, configuration, attachment types and owners, constructability notes, pre-construction photos, etc.
- Orbital conducts on-site evaluation of the need for power make-ready using handheld laser range finders to verify that making transfers will not result in NESC Violation.
- Double Wood Mitigation
- Orbital team communicates transfer requests to third party attachment owners through utility’s preferred notification system (NJUNS, SPANS, etc.) and enforces contracts up to and including support of billing third party attachment owners for late transfers.
- Orbital utilizes qualified subcontracted partner to mitigate double wood locations by transferring any remaining attachments, removing the double pole, and completing restoration (backfill, seed, concrete, etc.)
- Orbital utilizes its proprietary GIS web-based Double Wood Dashboard to manage data related to client’s double wood program.
- Utility stakeholders are provided access to the dashboard which enables near real-time monitoring of workflow progression for individual poles with photos provided at each construction step.
- All double wood locations are color coded in map view based on current workflow step to support prioritization/resource planning efforts.
- Filters, charts, and tables are available in the tool to allow for various levels of progress reporting.
More Projects
Utilities
138kV Substation Expansion
Substation Engineering
Featured
Natural Gas Processing
Natural Gas
Featured
345k Double Breaker Interconnect Substation
Construction Management
Utilities
Management Programs
Construction Management
Utilities
Inlet/Outlet Valve Evaluation
Natural Gas
Utilities
Odorant Replacement Project
Natural Gas
Utilities
138kv Substation Modification To Accommodate New Generation Tie Line
Substation Engineering
138kv Substation Modification To Accommodate New Generation Tie Line
Substation Engineering
Overview
- Location: Indiana
- Client: Midwest investor-owned utility
- Timeline: 12 Months
Scope
- Design expansion of existing substation yard to the west
- Design expansion of existing 138kv ring bus to the west. add new 138kv breaker position
- Design new 138kv h-frame structure to accommodate the new incoming 138kv line
- Design transmission line interconnection from first pole outside of the substation to the new h-frame
- Perform grounding study and design grounding improvements for the substation
- Design new control building to house new relay and metering panels
- Design fiber interconnection with existing communications system
More Projects
Utilities
138kV Substation Expansion
Substation Engineering
Featured
345k Double Breaker Interconnect Substation
Construction Management
Utilities
Management Programs
Construction Management
Utilities
Inlet/Outlet Valve Evaluation
Natural Gas
Utilities
Odorant Replacement Project
Natural Gas
Featured
Federal Funded Maintenance Program Management
Natural Gas
Utilities
Main Replacement Program – Class 4/5 Estimates
Natural Gas
Main Replacement Program – Class 4/5 Estimates
Natural Gas
Overview
- Location: Indiana
- Client: Midwest Investor-Owned Utility
- Timeline: 6 Months
Scope
- Reviewed four years of pipeline replacement plans totaling 240 miles
- Applied Class 4 estimates to 70 miles: Class 5 estimates to 170 miles
- Incorporated a 5% annual inflation factor
- Retirement estimates assumed in-place retirement except at aerial crossings
- Estimates included design, labor, material, construction costs, safety oversight, and restoration requirements
- Risk-ranked spreadsheet provided by client guided scope prioritization
- Preliminary design identified critical crossings and restoration areas
More Projects
Utilities
138kV Substation Expansion
Substation Engineering
Featured
345k Double Breaker Interconnect Substation
Construction Management
Utilities
Management Programs
Construction Management
Utilities
Inlet/Outlet Valve Evaluation
Natural Gas
Utilities
Odorant Replacement Project
Natural Gas
Featured
Federal Funded Maintenance Program Management
Natural Gas
Utilities
Odorant Replacement Project
Natural Gas
Odorant Replacement Project
Natural Gas
Scope of Work
- Replaced aged odorant injection system, storage tank, containment, and building at gate station
- Decommissioned and remove existing and abandoned odorant systems and associated infrastructure
- Developed and install new odorant system including shelter, piping, controls, foundations, and electrical
- Coordinated full engineering lifecycle: design, demolition, procurement support, construction oversight, and commissioning
- Executed project within defined shut-in window to maintain system reliability and operational continuity
Deliverables
- Redlined piping and instrumentation diagrams, 3D model, isometric piping drawings, construction bill of material, and valve tie-in lists
- Civil, mechanical, structural, and electrical drawings
- Demolition drawing packages with mechanical, electrical, and instrumentation and controls scopes
- Procurement packages for tank, building, odorant system, and temporary odorization
- On-site construction support, contractor coordination, and commissioning oversight
- Final documentation including updated drawings, redlines, and closeout package
Project Highlights
- The project executed a full odorant system replacement within a limited five-month shut-in window, managing the demolition of two systems in parallel with the new installation to maintain site layout. The team proactively coordinated a temporary odorization option in case of commissioning delays, provided continuous oversight from initial design through construction and as-built documentation, and supported the development of long-term record drawings and standardized site files for future reuse.
More Projects
Utilities
138kV Substation Expansion
Substation Engineering
Featured
345k Double Breaker Interconnect Substation
Construction Management
Utilities
Management Programs
Construction Management
Utilities
Inlet/Outlet Valve Evaluation
Natural Gas
Featured
Federal Funded Maintenance Program Management
Natural Gas
Utilities
Utilities and Internet Service Providers
Joint Use Make Ready Engineering
Utilities
Buried Regulator Program Evaluation
Natural Gas
Buried Regulator Program Evaluation
Natural Gas
Scope of Work
- Evaluated 3,300 buried gas regulators across a regional network
- Developed cost-efficient remediation strategies based on risk and infrastructure proximity
- Assessed replacement options, including mainline extensions and above-grade designs
- Benchmarked project costs using historical construction data
- Built geospatial tools to identify regional clusters and prioritize replacements
- Created installation guidelines using a data-driven breakeven distance threshold
Deliverables
- Engineering assessment report including:
- Cost comparisons for above-grade vs. below-grade remediation methods
- Risk evaluation and compliance considerations
- Capital project analysis of 27 replacement efforts
- GIS-based proximity analysis and cluster modeling to guide future planning
- Prioritization tool using spreadsheet, dashboard, and geospatial integration
- Replacement decision-making framework incorporating breakeven cost thresholds
- Tracking enhancements to align asset records across engineering and mapping systems
Project Highlights
- The project produced a utility-wide remediation model for buried gas regulators, defining per-regulator cost drivers and a breakeven point for choosing between regulator replacement and main extensions. Orbital analyzed multiple design alternatives to standardize future installations and enable strategic, program-wide planning through GIS, engineering analytics, and stakeholder input.
More Projects
Utilities
138kV Substation Expansion
Substation Engineering
Featured
345k Double Breaker Interconnect Substation
Construction Management
Utilities
Management Programs
Construction Management
Utilities
Inlet/Outlet Valve Evaluation
Natural Gas
Utilities
Odorant Replacement Project
Natural Gas
Featured
Federal Funded Maintenance Program Management
Natural Gas