Barge Unloading Project
Barge Unloading Project
This project included the design of a new pipe bridge to unload liquid from barges on the Mississippi River. Orbital worked with local, state and Army Corp to obtain the permit for the new barge unloading system. Design included new bridge, foundation, piping, stair towers and tie-ins to the existing systems. The bridge design had to take into account a 54 ½ feet river elevation change.
UAV Inspection
Unmanned Aerial Vehicle (UAV) Inspections combined with Alignment Surveys of Crane Runways Orbital Technical Solutions (OTS) provided Asset Integrity Services with use of Unmanned Aerial Vehicles (UAVs) and survey equipment. The equipment was used to complete visual...